Copy Load Case

You can copy all loads from one load case to another load case.
From Load Case
Select the source load case from which you want to copy the loads.
To Load Case
Select the destination load case to which you want to copy the loads.
Copy Operation
All loads (beam loads, node loads, node displacements, and surface loads) from the source load case will be copied to the destination load case.